Documentation development
We have developed regulation the following docu-ments, O&G loss norms and technology regulations:
– “Design and construction of submerged cross-ings of crude oil upstream pipelines” (“Bashneft”, 1998);
– “Rules of operation, maintenance control and overhaul of submerged crossings of crude oil up-stream pipelines” (“Bashneft”, 1999);
– “Vertical steel tank inspection manual” (“Kaz-TransOil”, 2000);
– “Submerged crossings of crude oil upstream pipelines. Design and construction code of practice” (Ministry of Industry and Energy of Russian Federa-tion, 2002);
– “Submerged crossings of crude oil upstream pipelines. Rules of maintenance and overhaul” (Minis-try of Industry and Energy of Russian Federation, 2002);
– “Rules of technical inspection of crude oil transfer pipelines using in-line smart pigs” (“KazTransOil”, 2001);
– “Guidelines for replacing the crude oil from linear segments of crude oil transfer pipelines” (“Kaz-TransOil”, 2002);
– “Guidelines for abandoning and demolition of lin-ear segments of crude oil transfer pipelines” (“Kaz-TransOil”, 2002);
– “Guidelines for operating procedure of pipeline submerged crossings surveillance, using downhole smart pigs” (2003);
– Technology regulations of O&G skimming and processing facilities’ operation: booster stations, sew-age pumping stations, preliminary water removal units, pipeline commissioning stations: (“Oren-burgneft”, “TNK-Nyagan”, “Samaraneftegaz”, “Gaz-promneft-Orenburg” an others, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014);
– Rules of crude oil upstream pipelines operation (“Orenburgneft”, “Rosneft-Purneftegaz” and others, 2006, 2011, 2012, 2013, 2014);
– Substantiating the loss norms for associated gas and utilizing the crude oil for needs of the company (“Udmurtneft”, “Rosneft-Yuganskneftegaz”, 2006, 2009);
– Elaboration of qualifying tests and examining the personnel proficiency (“KazTransOil”, 2000);
– Guidelines for preventive maintenance and oper-ation of upstream fiberglass pipes in the “Slavneft-Megionneftegaz” oilfield (2012);
for the purpose of preventive maintenance, overhaul and construction of upstream pipelines in the “Slavneft-Megionneftegaz” oilfield (2012);
– “Rules of technical inspection of upstream pipe-lines in “Slavneft-Megionneftegaz” (2012);
– “Rules of displacing the crude oil and abandon-ing the linear segment of upstream pipelines in “Slavneft-Megionneftegaz” (2012);
– “Rules of cleaning the “Orenburgneft” crude oil upstream pipelines from internal deposits” (2013).
We possess more than 15 years of experience in engineering standard-technical documents, as well as technology regulations of operating O&G facilities.